Kuunika Electrical and Solar Contractor
About Kuunika Electrical and Solar Contractor
Although the business was legally registered in 2011, the Director and Management Staff have more than 12 years' experience in the development, installation, maintenance and training in electrical and renewable energy systems for project sustainability. KESC has successfully implemented various electrical and renewable energy systems for individuals, communities, and organizations. KESC successfully worked with a Japanese company: Takaoka Engineering Company Ltd in the installation of 830kW Solar Grid Connected system for Kamuzu International Airport in 2013.Some of Past Track Records of Accomplishments – KESCIn 2018 KESC successfully installed 29 Units of Solar Direct Drive (SDD) fridges in rural health centres and health posts across the country on behalf of Vestfrost Solutions of Esbjerg, Denmark under GAVI/ UNICEF project Cold Chain Optimization Platform whose main beneficiary is Ministry of Health (Malawi). The project involved in country distribution services (transportation, warehousing and logistics), installations, training of Ministry of Health Technicians and commissioning of the solar fridges.KESC also designed and installed a 5kW solar back up system for Data Server Unit for Northern Region Water Board at their Main Office in Mzuzu.In 2016 - 2018 the company managed to install a 10kW solar backup system for Livingstonia Synod Aids Programme (LISAP). This comprises of Offices, Charlet, Hostels and Cafeteria. The system required designing, calculation of load requirement and installation, which was all done by KESC.In 2013-2015, University of Malawi - The Polytechnic WASHTED under the Scottish funded Malawi Renewable Energy Acceleration Programme (MREAP) engaged KESC in designing, installation and commissioning of solar system for various schools and rural health facilities in Chikwawa and Nsanje districts. We worked diligently, and communicated well together and with the team to successfully complete the project.
Social Link - Linkedin: http://www.linkedin.com/company/kuunika-electrical-and-solar-contractor
Employee Count: 11
Keywords: hardware