"
Geysers and security lighting perfectly installed and working
Wiring underway
The roof before tubing(laying of conduit pipes).
Power backup inverter and batteries successfully installed
Tubing and mounting of Metal boxes onto the walls
Anynomous
"
Geysers and security lighting perfectly installed and working
" 19 May 2023Anynomous
"
Wiring underway
" 07 May 2023Anynomous
"
The roof before tubing(laying of conduit pipes).
" 26 April 2023Anynomous
"
Power backup inverter and batteries successfully installed
" 27 March 2023Anynomous
"
Tubing and mounting of Metal boxes onto the walls
" 10 March 2023